Pondera’s Haliade-X 12 MW prototype in Port of Rotterdam has just set a new world record! It is the first wind turbine ever to generate 288 MWh over the course of 24 hours. In the next 5 years, the Haliade-X prototype will undergo a series of tests to validate the turbine’s power curve, loads, grid performance & reliability. In addition, these tests will allow GE to collect the data needed to obtain the Type Certificate, a key step in commercializing the Haliade-X.
Key figures for the Haliade-X 12 MW
Capacity: 12 MW
Rotor diameter: 220 m
Tip height: 245 m
Blade length: 107 m
Annual energy yield: 46.3 GWh
Wind turbine swept area: 38,000 m2
(These numbers are based on the SDE wind report)
General information
Pondera Development and SIF Holding, together with GE Renewable Energy, are developing the Haliade-X on the Maasvlakte 2 in Rotterdam. The development of the innovative Haliade-X project in Rotterdam has been made possible thanks to Pondera’s extensive knowledge and many years of experience in Dutch wind energy legislation and regulatory policy. The increase in size and scale of (offshore) wind turbines is an important step in generating more sustainable energy, accelerating the energy transition and thereby limiting the effects of climate change.
The offshore wind turbine prototype is installed onshore in order to ease access for testing and monitoring purposes. This will also allow GE to collect the data needed to obtain the Type Certificate, a key step in commercializing the Haliade-X.
The Haliade-X can generate 46.3 GWh of electricity annually. That is enough power for 15,900 European households and thus saves 28.1 kilotons of CO2.