PREPARING THE SITE FOR THE HALIADE-X 12 MW

Preparing the site that will host GE’s Haliade-X 12 MW, the most powerful offshore wind turbine in the world, to be installed in Maasvlakte-Rotterdam, Netherlands. HaliadeX 12 MW is currently being assembled at GE’s factory in Saint-Nazaire, France, while its three LM Wind Power-designed 107-metre blades are being manufactured in Cherbourg, France, and tower sections produced in Seville, Spain. All components will be shipped to Rotterdam, where pre-assembly work and installation will take place.